The live/work concept made famous by The Lofts projects located elsewhere in Santa Fe became a Railyard fixture with this PRAXIS-designed project. The marriage of concrete and steel sheet with signature industrial accents was the beautiful skin of a green design destined to be the first Platinum LEED building in New Mexico. The 2007 banking crisis ended this certification effort.
Specs:
Railyard, Santa Fe // Still under construction
26,300 sq ft
$4.3 M // $164/sq ft
Contractor: Davenport Construction Management